Base Building Information

Core and Shell Plans

Available Tenant
Specific Support

1. 2,500 kW generator on main roof, with a 250 gallon day tank
2. 2,500 kW generator on 39th floor, with a 250 gallon day tank
• Space available for additional generator capacity, if required
3. (2)  4,500 gallon fuel tanks on basement level
4. (1)  450 ton glycol condenser system located on main roof
5. Forty (40) tons supplemental water per floor. Additional available upon request
6. ASCO switches:
• 6 – 1,200 Amps
• 2 – 400 Amps
• 1 – 200 Amps
7. UPS: 4 @ 1,000 Amps located on “A” Level. The UPS systems are redundant to each other
8. Telecom/Riser Infrastructure: Tenant has their own primary POE on 52nd Street and a secondary POE on 53rd Street with telecommunication risers located in our north return air (Shaft 5) and south return air (Shaft 6) which is in the rear building area

Building Infrastructure

1. Main cooling tower – 5,400 tons
2. Lower cooling tower – 400 tons
3. Steam chillers – 2 @ 1,600 tons
4. Electric chiller – 1 @ 350 tons
5. Electric Capacity:
• 4 – 4,000 Amp services, 3 phase/480V
• Minimum 6 w/SF Demand
• Up to 11.75 watts/SF can be committed. Additional available from utility with appropriate load letter
6. Buss Ducts: 2 – TM (3000A); HB2 (2,000A)

Past Improvements

1. Elevator modification: completed in 2010
2. Hot/cold deck conversion: completed in 2014
3. Cooling towers: new 400 ton unit installed in 2016
4. Ddc controls: installed along the perimeter with new leanses
5. Luminous ceilings: restored and converted to led with new leanses
6. Completed building façade and exterior restoration 2017
7. High-efficiency induction units installation: completed in 2016 on south & west facades
8. Energy efficiency results:
• Max peak demand lowered by 855kw since 2012/13